home *** CD-ROM | disk | FTP | other *** search
/ Space & Astronomy / Space and Astronomy (October 1993).iso / mac / TEXT / SPACEDIG / V11_2 / V11_211.TXT < prev    next >
Internet Message Format  |  1991-07-08  |  17KB

  1. Return-path: <ota+space.mail-errors@andrew.cmu.edu>
  2. X-Andrew-Authenticated-as: 7997;andrew.cmu.edu;Ted Anderson
  3. Received: from beak.andrew.cmu.edu via trymail for +dist+/afs/andrew.cmu.edu/usr11/tm2b/space/space.dl@andrew.cmu.edu (->+dist+/afs/andrew.cmu.edu/usr11/tm2b/space/space.dl) (->ota+space.digests)
  4.           ID </afs/andrew.cmu.edu/usr1/ota/Mailbox/Ya64QRK00VcJQ3705C>;
  5.           Tue,  3 Apr 90 02:47:58 -0400 (EDT)
  6. Message-ID: <Qa64Q2y00VcJE35E5s@andrew.cmu.edu>
  7. Reply-To: space+@Andrew.CMU.EDU
  8. From: space-request+@Andrew.CMU.EDU
  9. To: space+@Andrew.CMU.EDU
  10. Date: Tue,  3 Apr 90 02:47:32 -0400 (EDT)
  11. Subject: SPACE Digest V11 #211
  12.  
  13. SPACE Digest                                     Volume 11 : Issue 211
  14.  
  15. Today's Topics:
  16.           Re: Will we lose another orbiter?
  17.            Payload Summary for 03/30/90 (Forwarded)
  18.               RE: SPACE Digest V11 #178
  19.              Re: Comparative Costs to LEO
  20.              Velikovsky's Theory
  21.                 JUNK IN SPACE
  22. ----------------------------------------------------------------------
  23.  
  24. Date: 29 Mar 90 19:16:58 GMT
  25. From: samsung!cs.utexas.edu!hp-sdd!ncr-sd!ncrlnk!ncrcce!ncrons!johnson@think.com  (Wayne D. Johnson)
  26. Subject: Re: Will we lose another orbiter?
  27.  
  28. In article <6927@timbuk.cray.com> lfa@timbuk.cray.com (Lou Adornato) writes:
  29. =>        One of the root causes of the Challenger accident, was public pressure
  30. =>to launch on schedule.  This was caused by the public's inability to understand just
  31. =>how complex and demanding launching an experimental aircraft can be.  Once people
  32. =>stop taking technology for granted, they start learning.  Maybe in the long run Challenger
  33. =>will have made us stronger by making us see the danger in having 90% of our population
  34. =>(and 100% of our policy makers) technologically illiterate.
  35.  
  36. I disagree.  It was not public pressure that was forcing NASA to fudge on safety
  37. It was NASA's impression of congress's impression of the public.  Both 
  38. impressions probably are faulty (IMHO).
  39.  
  40. =>In the light of basic probability, I don't see how a lower "risk" factor can be justified.
  41. =>
  42. =>Consider a single component with a reliability of 99.9999% (which is pretty good even
  43. =>for a small, simple component, like a rivet).  The chance of this part failing is
  44. =>one in 10,000.  If there are 1000 of these parts, then there is 1 chance in 10 that
  45. =>one of them will fail.  If you put a million of them into the system, then you have
  46. =>to expect that 100 of them _will_ fail.  In order to maintain a 98% safety margin, you
  47. =>have to increase the per-unit reliability by _three_ orders of magnitude.  Do you have
  48. =>any idea how to make a rivet 1000 times more reliable?  Keep in mind that making it heavier
  49. =>might reduce the reliability of some other component.  
  50.  
  51. That is assuming that the mission will fail if any of the parts fail.  The 
  52. main reason for redundant systems is to limit the failure rate by increasing
  53. the number of parts that may fail.  By having 3 redundant engines, failure of
  54. 1 critical part in 1 engine will not cause a "failure".  You probably know all
  55. of this, I'm just thinking out loud.
  56.  
  57. =>Yes, they should, no smileys about it.  Basic spares management policy would be to have
  58. =>a new orbiter ready after 50 flights (25 would be better), and then put it in "hot" storage
  59.  
  60. It might be a good idea to think about updating the design to start removing
  61. some of the risks as we are building a new shuttle.
  62. -- 
  63. Wayne Johnson         |  Is a baby's life worth more than the right to
  64. NCR Comten, Inc.      |  make a choice?  Babies are people too.
  65. Roseville MN 55113    +-----------------------------------------------------
  66. (Voice) 612-638-7665   (E-MAIL) W.Johnson@StPaul.NCR.COM
  67.  
  68. ------------------------------
  69.  
  70. Date: 31 Mar 90 14:24:13 GMT
  71. From: trident.arc.nasa.gov!yee@ames.arc.nasa.gov  (Peter E. Yee)
  72. Subject: Payload Summary for 03/30/90 (Forwarded)
  73.  
  74.  
  75.                                 Payload Status Report
  76.                                 Friday, March 30, 1990
  77.  
  78.           George H. Diller
  79.           NASA Kennedy Space Center
  80.  
  81.  
  82.  
  83.           HUBBLE SPACE TELESCOPE
  84.  
  85.                The installation of the telescope into the payload canister
  86.           was completed on Friday, Mar. 23.  Transportation of HST on the
  87.           ten-mile trip from the Vertical Processing Facility to launch pad
  88.           39-B began just after midnight on Sunday morning, Mar. 25.  It
  89.           arrived at the pad at dawn.
  90.  
  91.                Removal of the protective cocoon from around the telescope
  92.           and opening of Discovery's payload bay doors was rescheduled by
  93.           one day to Tuesday, Mar. 26, to deal with insects.  Midges, an
  94.           insect resembling a small mosquito, was observed on the payload
  95.           bay doors of the orbiter.  Some escaped into the payload
  96.           changeout room.  Those remaining were vacuumed off.  Seven traps
  97.           were placed in the PCR.  Collectively, a total of 40 midges were
  98.           removed from the facility.
  99.  
  100.                Because the cocoon remained in place around HST there was no
  101.           path for the midges to enter the telescope.  The cocoon removal
  102.           did not begin until traps provided confidence that there was not
  103.           additional risk.  At 4:30 a.m. on Wednesday, Mar. 28, the traps
  104.           were removed.  Telescope installation was rescheduled for one day
  105.           later to schedule crews and permit some Space Shuttle ordnance
  106.           work to be accomplished.
  107.  
  108.                The transfer of the Hubble Space Telescope into the payload
  109.           bay of Discovery began at 10:40 a.m. on Thursday, Mar. 29.  The
  110.           HST was locked into the first of four payload bay retention
  111.           latches at 3:55 p.m. and into the last latch at 4:40 p.m.
  112.           Electrical connections were established between the HST and the
  113.           orbiter overnight and this morning, leading to a 6.5 hour
  114.           Interface Verification Test scheduled to begin at the start of on
  115.           second shift at 4:00 p.m. to verify those connections.
  116.  
  117.                At midnight on Sunday morning, Apr. 1,  a 52-hour of Pad
  118.           Confidence Test will begin as a final check of the telescopes's
  119.           systems and its onboard science instruments.
  120.  
  121.                These tests will also verify remote communications
  122.           capability to the Space Telescope Operations Control Center
  123.           (STOCC) at NASA's Goddard Space Flight Center in Greenbelt, Md.,
  124.           the Huntsville Operations Support Center (HOSC) at the Marshall
  125.           Space Flight Center in Huntsville, Alabama, and the Lockheed
  126.           plant at Sunnyvalve, Calif.  The STOCC will be able to receive
  127.           data and send commands through Discovery's communications systems
  128.           which are connected to the Hubble Space Telescope in the payload
  129.           bay.  The HOSC and Lockheed Sunnyvale will be monitoring the
  130.           spacecraft systems.
  131.  
  132.                The final work to be performed will be approximately 132
  133.           hours of battery charging scheduled to be completed 68 hours
  134.           before launch, after which the payload bay doors of the orbiter
  135.           are to be closed.
  136.  
  137.  
  138.  
  139.           GAMMA RAY OBSERVATORY
  140.  
  141.                Weight and center of gravity measurements have been
  142.           completed to determine whether any refinements need to be made.
  143.           Observed offsets will be compensated for by repositioning the
  144.           orbit adjust thrusters or by ballasting certain locations of the
  145.           spacecraft.
  146.  
  147.                Testing with the Payload Operations Control Center (POCC) at
  148.           the Goddard Space Flight Center was completed late Tuesday.
  149.           These tests simulated procedures to be used later when GRO is in
  150.           the payload bay of Atlantis, and again for a predeployment
  151.           checkout exercise.  As part of this exercise, all science
  152.           instruments were operated during the "34 Hour Test."   This was
  153.           essentially an end-to-end test which allowed data flows to be
  154.           sent to science investigators at other NASA centers or
  155.           laboratories which sponsor one of the GRO instruments.
  156.  
  157.                Also part of the exercise was a test of the Ephemeris
  158.           program and associated spacecraft computers.  This was two
  159.           consecutive software loads of a program which deals with the
  160.           predicted orbital characteristics of the Gamma Ray Observatory.
  161.           This is used by the satellite to control certain on-orbit
  162.           spacecraft activities based on the satellite's geographic
  163.           location.  Trouble shooting became necessary early in the test to
  164.           resolve issues with computer updates of internal clock software;
  165.           however, this allowed engineers to perform and complete the test
  166.           successfully.  Portions of this test may be repeated later.
  167.  
  168.                Yesterday, checks began of the other onboard computer
  169.           software.  These programs were used during functional testing of
  170.           the observatory's instruments, and the software associated with
  171.           them can now be refined.
  172.  
  173.  
  174.  
  175.  
  176.                                 PAYLOAD STATUS REPORT
  177.                                 FRIDAY, MAR. 30, 1990
  178.  
  179.  
  180.           Patricia E. Phillips
  181.           NASA Public Affairs,
  182.           Kennedy Space Center
  183.  
  184.           ASTRO-1/STS-35
  185.           (OPF)
  186.  
  187.                The ASTRO-1 astrophysics payload has successfully  completed
  188.           an  extensive  series  of testing in Columbia's payload bay.  The
  189.           test team moved smoothly through the Crew  Equipment  Integration
  190.           Test (CEIT),  the interface verification test (IVT), and the end-
  191.           to-end test.  The series of tests confirmed  that  communications
  192.           between  orbiter  and payload are operational,  as are communica-
  193.           tions  between  orbiter,  payload,  KSC,  Marshall  Space  Flight
  194.           Center,  Goddard Space Flight Center,  Johnson Space Center,  and
  195.           satellite relays.
  196.  
  197.                During the testing,  a signal conditioning box that  handles
  198.           data between the orbiter and the payload experienced a failure of
  199.           one circuit. This box, called a Remote Amplifier and Advisory Box
  200.           (RAAB),  immediately switched to its redundant circuit, and test-
  201.           ing was completed without any impact.
  202.  
  203.                Following completion  of  testing,  engineers  and  managers
  204.           decided to replace the unit,  which is housed near the top of the
  205.           ASTRO-1 igloo.  The "remove and  replace"  procedure  was  worked
  206.           overnight Mar. 28/29. Operations went so smoothly that retests of
  207.           the new RAAB and its linkages were underway by 4 a.m. Mar. 29 and
  208.           completed that same day.
  209.  
  210.                Pre-flight  processing  for  ASTRO-1 will include regularly-
  211.           scheduled BBXRT servicing,  as well  as  continued  contamination
  212.           control and temperature monitoring.
  213.  
  214.  
  215.           SPACELAB LIFE SCIENCES (SLS-1)/STS-40
  216.           (O&C Building)
  217.  
  218.                The  floor  assembly and racks were moved to Test Stand 2 on
  219.           Mar.  29 in preparation for integration there with  the  Spacelab
  220.           module.  The integration is scheduled to begin Monday.
  221.  
  222.                STS-40 Mission Commander Bryan O'Connor was on hand Mar.  29
  223.           as technicians began moving the components to Test Stand  2.  The
  224.           combination  of  moving  elements and integration with the module
  225.           will take several days.
  226.  
  227.                A replacement for a low-G centrifuge that  experienced  tem-
  228.           perature  fluctuations was installed.  The new unit,  an upgraded
  229.           one, successfully passed retesting.
  230.  
  231.                SLS-1 will be launched in August aboard Columbia.
  232.  
  233.  
  234.  
  235.           INTERNATIONAL MICROGRAVITY LABORATORY (IML)/STS-42
  236.           (O&C Building)
  237.  
  238.                Technicians continue the buildup  and  integration  of  com-
  239.           ponents  and  racks for IML,  scheduled to fly aboard Columbia in
  240.           December.
  241.  
  242.                An international mission,  IML will have a  crew  of  seven.
  243.           Five international space science research organizations are work-
  244.           ing  with  NASA  on  IML:  the  European Space Agency (ESA),  the
  245.           Canadian Space Agency (CSA), the French National Center for Space
  246.           Studies (CNEW),  the West German  Research  and  Development  In-
  247.           stitute  for  Air  and  Spacecraft (DLR),  and the National Space
  248.           Development Agency of Japan.
  249.  
  250. ------------------------------
  251.  
  252. Date: Sat, 31 Mar 90 23:37 EST
  253. From: CCUWINT%INDSVAX1.BITNET@vma.cc.cmu.edu
  254. Subject: RE: SPACE Digest V11 #178
  255.  
  256. How can I be removed from this list?  The mail is overwhelming my
  257. account!
  258.  
  259.                                         HELP!
  260.                                         Don Winters
  261.  
  262. ------------------------------
  263.  
  264. Date: 1 Apr 90 03:13:13 GMT
  265. From: wuarchive!cs.utexas.edu!news-server.csri.toronto.edu!utgpu!utzoo!henry@decwrl.dec.com  (Henry Spencer)
  266. Subject: Re: Comparative Costs to LEO
  267.  
  268. In article <651@idacrd.UUCP> mac@idacrd.UUCP (Robert McGwier) writes:
  269. >If the world wanted to put stuff in a 250km high, 28 to 58 degree inclination
  270. >orbit, your numbers would be meaningful.  Since BY FAR, most of the
  271. >LEO shots are polar...
  272.  
  273. Um, you've forgotten a goodly assortment of science missions -- e.g. the
  274. Hubble telescope -- which merely want to get into orbit and don't greatly
  275. care which orbit.  Space is not just comsats and spooks.
  276. -- 
  277. Apollo @ 8yrs: one small step.|     Henry Spencer at U of Toronto Zoology
  278. Space station @ 8yrs:        .| uunet!attcan!utzoo!henry henry@zoo.toronto.edu
  279.  
  280. ------------------------------
  281.  
  282. Date: 28 Mar 90 21:51:15 GMT
  283. From: eru!luth!sunic!mcsun!ukc!reading!cf-cm!cybaswan!iiitsh@bloom-beacon.mit.edu  (Steve Hosgood)
  284. Subject: Velikovsky's Theory
  285.  
  286. As many of you probably know, a guy called Immanuel Velikovsky published
  287. a couple of books in the 1950's entitled "Worlds in Collision" and "Ages in
  288. Chaos". Maybe he wrote others too - it's not important.
  289.  
  290. He postulated that several times in recent (i.e recorded) history, the
  291. orbits of Mars and Venus were disturbed wildly, and those planets
  292. came in close contact with the earth. The resulting tidal forces, and spin
  293. changes and orbit changes for the earth caused such legends as the Biblical
  294. flood and others to be written - based on fact. Indeed, unless he does
  295. a serious lying job, it seems that many cultures have a flood myth, and many
  296. claim that the sun stopped in its tracks one day (or maybe that the night was
  297. very long if they were on the other side of the planet).
  298.  
  299. Things are quieter these days, and it seems highly unlikely that Mars or
  300. Venus should have strayed from their orbits. However, it seems that current
  301. thoughts are that the planetary orbits are chaotic in nature (mathematically
  302. chaotic, that is), and maybe in the light of this , strange things
  303. could have happened once or twice. Maybe they will happen again, though
  304. the nature of chaos probably prevents a sensible prediction.
  305.  
  306. Certainly, Venus has a retrograde spin, and it seems Mars *may* have had
  307. running liquids on its surface recently enough that the sandstorms have
  308. not yet removed the evidence. Both of these facts seem a bit odd, yet are
  309. known to be true.
  310.  
  311. Has Velikovsky's theory held up under attack from supercomputer simulations
  312. in recent years? Any info? Enquiring minds would like to know.
  313.  
  314. THanks for your time reading this.
  315. Steve
  316.  
  317. iiitsh@pyr.swan.ac.uk
  318. or
  319. iiitsh@cybaswan.uucp
  320.  
  321. ------------------------------
  322.  
  323. Date: 2 Apr 90 06:36:17 GMT
  324. From: zaphod.mps.ohio-state.edu!unix.cis.pitt.edu!fmgst@tut.cis.ohio-state.edu  (Filip G.)
  325. Subject: JUNK IN SPACE
  326.  
  327.  
  328.     Greetings. I have heard a few times that man has launched
  329.  
  330.     so many sattelites and other "junk" into orbit that, in the
  331.     
  332.     future, there might be problems with having collisions. And,
  333.     
  334.     in my humble opinnion (IMHO), things are getting worse. For 
  335.  
  336.     example, correct me if I'm wrong, do the NASA people have to
  337.  
  338.     worry about "unexpected", old, non-functional, satellites
  339.  
  340.     "tumbling" to earth in a collision path with a newly deployed
  341.  
  342.     satellite. It seems to me that instead of building a space
  343.  
  344.     station, NASA should worry about "cleaning up" the earth's
  345.  
  346.     orbit and not "polluting" it more. Also, in the news, I 
  347.  
  348.     heard that the "promised" space station would require
  349.  
  350.     billions in maintenance. Are those expenses due to all that
  351.  
  352.     "junk" in space, or particles of thereof? Please correct
  353.  
  354.     me if I'm wrong, but the only "safe" way to exist in space
  355.  
  356.     for any period of time would be to "quickly" invent/implement
  357.  
  358.     a "force" field or shield. (Like StarWars or StarTrek...:-)
  359.  
  360.                 Tell me what you think...
  361.  
  362.                 fmgst@unix.cis.pitt.edu
  363.  
  364. -- 
  365. _______________________________________________________________________________
  366. "The FORCE will be with you. Always." It *IS_ with me and has been for 8 years.
  367. Filip Gieszczykiewicz "..of future fame...." "Ok! so I have a dream..."
  368. FMGST@PITTVMS  or  fmgst@unix.cis.pittsburgh.edu
  369.  
  370. ------------------------------
  371.  
  372. End of SPACE Digest V11 #211
  373. *******************
  374.